Create your invoice
Your business
Bill to
Invoice details
Extras
Payment
Notes & terms
“Open in email app” starts a draft in your own email app. Download the PDF first and attach it yourself — BillWisely doesn't send emails for you.
Bill building and renovation work the way clients and lenders check it: labor, materials, permits, approved change orders, milestones and what has already been paid.
Free PDF download. No signup. No watermark.
Each one starts with typical lines for the job. Example prices are fictional, so replace them with your own.
A smaller job billed on completion, with labor and materials kept apart.
Professional designProgress billing at an agreed stage, with retention held back and earlier payments subtracted.
Bold designThe closing invoice once the work is signed off, including released retention.
Minimal design“Open in email app” starts a draft in your own email app. Download the PDF first and attach it yourself — BillWisely doesn't send emails for you.
Choose a labor-and-materials, milestone or final-invoice layout.
Add the project, job-site address and contract reference, then labor, materials, permits and any approved change orders on separate lines.
Enter earlier payments so the balance is right, and note retention if your contract uses it.
Download the PDF and send it with photos or sign-off documents, or email it.
Construction invoices are checked against a contract, sometimes by a lender or quantity surveyor as well as the owner. Each charge should trace back to the contract or an approved change order.
The owner wants to know what stage is complete, that extras were approved, what they've already paid and what (if anything) is being held back.
At each milestone in the payment schedule, monthly for progress billing, and a final invoice at completion or sign-off.
An estimate or bid prices the job before it starts. The contract fixes the scope. A change order changes it. The invoice bills completed work against all of them.
Billing something else? The free invoice generator works for any business.
Clearer invoices can reduce disputes and make it easier for customers to pay and come back.
Why it matters: Owners refuse items they believe were included.
With BillWisely: Detailed line descriptions plus the contract reference in the job details.
Why it matters: Materials bought mid-job are easily missed.
With BillWisely: Separate material lines with quantities and costs.
Why it matters: Waiting for completion strains small contractors.
With BillWisely: The milestone layout bills each stage, with earlier payments subtracted automatically.
Why it matters: Verbal extras are the most disputed charges in construction.
With BillWisely: Change-order lines carry the CO number, and the guidance here recommends billing only approved changes.
Why it matters: Missed payments or retention cause end-of-job disputes.
With BillWisely: Retention (a percentage or fixed amount, with its basis printed) and payments received are each deducted on their own line, so both sides see how the balance due was reached.
A builder bills Stage 2 of an extension at $18,000, plus an approved $1,250 skylight change order. The Stage 1 payment of $6,000 has been received. All names and numbers are fictional.
| Item | Qty | Rate | Amount |
|---|---|---|---|
| Stage 2 of 4 | 1 | $18,000.00 | $18,000.00 |
| Change order CO-02 | 1 | $1,250.00 | $1,250.00 |
| Subtotal | $19,250.00 | ||
| Total | $19,250.00 | ||
| Retention withheld (5% of $19,250.00) | − $962.50 | ||
| Less payments received | − $6,000.00 | ||
| Balance due | $12,287.50 | ||
$18,000.00 + $1,250.00 = $19,250.00 for this invoice. The contract holds back 5% retention: 5% of $19,250.00 is $962.50. After the $6,000.00 already received, $12,287.50 is due now; the $962.50 retention is invoiced when it's released.
Back from site? Say the labor hours, materials and any approved change orders, and BillWisely sets out the lines for you to review.
You review every line before anything is downloaded or sent. Nothing is sent from a spoken instruction without your click.
Optionally offer clients a small reward, such as a discount on future maintenance, after a verified on-time payment. It's a preview feature, and spins switch on later.
Example rewards: 5% off the next order · $20 off the next invoice · A free service or bonus · Your own reward. You choose the prizes and their chances; your client sees the odds and conditions.
Your business and license details if required locally, the client, the project and job-site address, the contract reference, labor, materials, permits, approved change orders, earlier payments, the total due, the due date and payment instructions.
Yes. It's clearer, it helps with tax treatment in some places, and some jurisdictions or contracts require it.
Invoicing in stages (by milestone or percent complete) instead of all at the end. Each invoice states the stage and subtracts earlier payments.
Only after it's approved in writing. Add it as its own line with the change-order number and price.
Bill the deposit when the contract is signed (where allowed locally), then show it under payments received on later invoices. Some places cap deposits for home improvement work, so check local rules.
A percentage of each payment held back until completion, if the contract says so (often 5–10%). Show it clearly so both sides track the amount held.
At practical completion or sign-off, including any released retention and final change orders.
Some states and countries require it on contracts or invoices for licensed trades. Add it in your business details if it applies.
The estimate predicts the cost before work starts; the invoice bills actual completed work. Use our estimate generator for the first step.
Yes, with no signup and no watermark. Nothing you type is saved.
Rules differ by country, state and industry. These official pages are a starting point, not legal or tax advice.
Use a template above, or start from a blank invoice.