Free Contractor Invoice Template

Bill building and renovation work the way clients and lenders check it: labor, materials, permits, approved change orders, milestones and what has already been paid.

Free PDF download. No signup. No watermark.

Choose a contractor invoice template

Each one starts with typical lines for the job. Example prices are fictional, so replace them with your own.

Create your invoice

Your business

Bill to

Invoice details

Extras

$0.00

Payment

Notes & terms

How to create a contractor invoice

  1. Step 1

    Choose your invoice template

    Choose a labor-and-materials, milestone or final-invoice layout.

  2. Step 2

    Add your business, customer and job details

    Add the project, job-site address and contract reference, then labor, materials, permits and any approved change orders on separate lines.

  3. Step 3

    Review the calculations and preview

    Enter earlier payments so the balance is right, and note retention if your contract uses it.

  4. Step 4

    Download the PDF or send it by email

    Download the PDF and send it with photos or sign-off documents, or email it.

What should a contractor invoice include?

Construction invoices are checked against a contract, sometimes by a lender or quantity surveyor as well as the owner. Each charge should trace back to the contract or an approved change order.

Project name and job-site address
Owners and lenders often fund several jobs.
Contract reference
Every amount should trace back to it.
Labor and materials (separately)
Clients and sometimes local rules expect them apart.
Approved change orders
Extra work is billed only against a signed change, with its number.
Milestone or % completeOptional
Progress billing explains what stage is being paid for.
Previous payments and retentionOptional
Shows the true balance and anything held back under the contract.
Permits and inspectionsOptional
Pass-through costs shown clearly.

What customers check before paying

The owner wants to know what stage is complete, that extras were approved, what they've already paid and what (if anything) is being held back.

Common mistakes

  • Billing extra work without a signed change order.
  • Leaving out earlier payments, so the balance looks too high.
  • Hiding materials inside a single "job" price.
  • Forgetting permit and dump fees.

When to send it

At each milestone in the payment schedule, monthly for progress billing, and a final invoice at completion or sign-off.

Invoice, estimate, quote or receipt?

An estimate or bid prices the job before it starts. The contract fixes the scope. A change order changes it. The invoice bills completed work against all of them.

Five contractor invoicing problems, and how to prevent them

Clearer invoices can reduce disputes and make it easier for customers to pay and come back.

  1. Scope disputes

    Why it matters: Owners refuse items they believe were included.

    With BillWisely: Detailed line descriptions plus the contract reference in the job details.

  2. Unbilled materials

    Why it matters: Materials bought mid-job are easily missed.

    With BillWisely: Separate material lines with quantities and costs.

  3. Cash-flow pressure

    Why it matters: Waiting for completion strains small contractors.

    With BillWisely: The milestone layout bills each stage, with earlier payments subtracted automatically.

  4. Unpaid additional work

    Why it matters: Verbal extras are the most disputed charges in construction.

    With BillWisely: Change-order lines carry the CO number, and the guidance here recommends billing only approved changes.

  5. Incorrect final balances

    Why it matters: Missed payments or retention cause end-of-job disputes.

    With BillWisely: Retention (a percentage or fixed amount, with its basis printed) and payments received are each deducted on their own line, so both sides see how the balance due was reached.

Worked example

A builder bills Stage 2 of an extension at $18,000, plus an approved $1,250 skylight change order. The Stage 1 payment of $6,000 has been received. All names and numbers are fictional.

Example invoice calculation
ItemQtyRateAmount
Stage 2 of 41$18,000.00$18,000.00
Change order CO-021$1,250.00$1,250.00
Subtotal$19,250.00
Total$19,250.00
Retention withheld (5% of $19,250.00)− $962.50
Less payments received− $6,000.00
Balance due$12,287.50

$18,000.00 + $1,250.00 = $19,250.00 for this invoice. The contract holds back 5% retention: 5% of $19,250.00 is $962.50. After the $6,000.00 already received, $12,287.50 is due now; the $962.50 retention is invoiced when it's released.

More than a template

Coming soon

AI Voice invoice creation

Back from site? Say the labor hours, materials and any approved change orders, and BillWisely sets out the lines for you to review.

You review every line before anything is downloaded or sent. Nothing is sent from a spoken instruction without your click.

Preview feature

Pay-early reward wheel

Optionally offer clients a small reward, such as a discount on future maintenance, after a verified on-time payment. It's a preview feature, and spins switch on later.

  1. Create an invoice
  2. Set an early-payment deadline
  3. Choose prizes and their chances
  4. Send the invoice
  5. After a verified on-time payment, your client gets one spin

Example rewards: 5% off the next order · $20 off the next invoice · A free service or bonus · Your own reward. You choose the prizes and their chances; your client sees the odds and conditions.

Designed to encourage on-time payment. Spins only unlock after a verified payment.

Contractor Invoice Template: frequently asked questions

What should a contractor invoice include?

Your business and license details if required locally, the client, the project and job-site address, the contract reference, labor, materials, permits, approved change orders, earlier payments, the total due, the due date and payment instructions.

Should labor and materials be listed separately?

Yes. It's clearer, it helps with tax treatment in some places, and some jurisdictions or contracts require it.

What is progress billing?

Invoicing in stages (by milestone or percent complete) instead of all at the end. Each invoice states the stage and subtracts earlier payments.

How do I bill a change order?

Only after it's approved in writing. Add it as its own line with the change-order number and price.

How do deposits work on construction invoices?

Bill the deposit when the contract is signed (where allowed locally), then show it under payments received on later invoices. Some places cap deposits for home improvement work, so check local rules.

What is retention (retainage)?

A percentage of each payment held back until completion, if the contract says so (often 5–10%). Show it clearly so both sides track the amount held.

When should I send the final invoice?

At practical completion or sign-off, including any released retention and final change orders.

Do I need a license number on my invoice?

Some states and countries require it on contracts or invoices for licensed trades. Add it in your business details if it applies.

How is a contractor invoice different from an estimate?

The estimate predicts the cost before work starts; the invoice bills actual completed work. Use our estimate generator for the first step.

Can I download a contractor invoice PDF free?

Yes, with no signup and no watermark. Nothing you type is saved.

Sources and further reading

Rules differ by country, state and industry. These official pages are a starting point, not legal or tax advice.

Ready to bill?

Use a template above, or start from a blank invoice.